I was the lead technician for this project at HOK. I managed all of the BIM models, assisted the designers with Rhino modelling and helped render images for client meetings with Aramco. HOK was the design architect for Omrania Architects who delivered the Construction Documents and managed the Construction Administration. 

CMA_01.jpg

I was laid off by HOK during the economic crisis in 2009 and received a call four weeks later from Omrania asking me to join them in Bahrain. I would have taken it had I not already accepted the job at FKP as a BIM Manager for the Equipment Collaborative Team